Refurb came in 18k over, what do you do to stop that happening again?
Finished a two bed flip last month. Budget was 32k and it ended up near 50k because the electrics needed a full rewire and the plaster came off with the wallpaper. I had a 10% contingency which was a joke. What percentage do you actually use on older stuff?